Jump to content

PROGRAMME and PRESENTATIONS

SATURDAY - DECEMBER 11

09:00 - 09:10 hWelcome

(M. Rothacher / B. Richter)
Session 1 aCombination Pilot Project and CONT'02 ("Weekly" SINEX)

chaired by Z. Altamimi
09:10 - 09:25 hStatus and future of the IERS CPP

M. Rothacher

Download:
Status and future of the IERS Combination Pilot Project (PDF, 5MB, Not barrier-free file.) (not accessible) [PDF, 6 MB]
09:25 - 09:35 hResults of CONT'02 combination studies

D. Angermann, M. Krügel, D. Thaller, M. Rothacher, R. Schmid, V. Tesmer

Download:
Results of CONT02 combination studies (PDF, 858KB, Not barrier-free file.) (not accessible) [PDF, 858 KB]
09:35 - 09:45 hRigorous combination of high-frequency ERP's and troposphere parameters from GPS, VLBI and SLR (CONT'02)

D. Thaller, M. Krügel, D. Angermann, M. Rothacher, R. Schmid, V. Tesmer

Download:
Rigorous combination of high-frequency ERPs and troposphere parameters from GPS, VLBI and SLR (CONT02) (PDF, 7MB, Not barrier-free file.) (not accessible) [PDF, 7 MB]
09:45 - 10:00 hIERS Combination Pilot Project. The point of view of an individual DORIS analysis center

P. Willis

Download:
The point of view of an individual DORIS Analysis Center (PDF, 1MB, Not barrier-free file.) (not accessible) [PDF, 2 MB]
10:00 - 10:15 hContributions of the ILRS to the IERS CPP

C. Luceri, R. Devoti, C. Sciarretta

Download:
The API contribution to the IERS-CPP activities (PDF, 67KB, Not barrier-free file.) (not accessible) [PDF, 67 KB]
10:15 - 10:20 hContribution of the IVS to the IERS CPP

A. Nothnagel (presented by Chopo Ma)

Download:
Contribution of the IVS to the IERS Combination Pilot Project (PDF, 40KB, Not barrier-free file.) (not accessible) [PDF, 40 KB]
10:20 - 10:25 hIVS CONT'05 campaign

J. Gipson

Download:
CONT05 (PDF, 1MB, Not barrier-free file.) (not accessible) [PDF, 2 MB]
10:25 - 10:50 hCoffee break
Session 1 bCombination Pilot Project and CONT'02 ("Weekly" SINEX)

chaired by M. Rothacher
10:50 - 11:05 hIGS SINEX combination and products

R. Ferland

Download:
IGS Reference Frame - Combination and Products (PDF, 820KB, Not barrier-free file.) (not accessible) [PDF, 820 KB]
11:05 - 11:20 hComparison of weekly GPS and SLR coordinate / ERP combinations

P. Clarke, K. Nurutdinov

Download:
COMPARISON OF WEEKLY GPS AND SLR COORDINATE / ERP COMBINATIONS (PDF, 811KB, Not barrier-free file.) (not accessible) [PDF, 811 KB]
11:20 - 11:35 hActivities of GRGS concerning combinations ath the level of observations

R. Biancale, D. Gambis

Download:
Combination of space geodesy techniques for monitoring the kinematics of the Earth (PDF, 2MB, Not barrier-free file.) (not accessible) [PDF, 2 MB]
11:35 - 11:50 hAn evaluation of currently available "weekly" intra-technique combinations

T. Johnson

Download:
An Evaluation of the Currently Available “Weekly” Intra-Technique Combinations (Preliminary Results) (PDF, 651KB, Not barrier-free file.) (not accessible) [PDF, 651 KB]
11:50 - 12:05 hAnalysis of local tie information and biases

D. Angermann, M. Krügel, B. Meisel

Download:
Analysis of local tie information and biases (PDF, 3MB, Not barrier-free file.) (not accessible) [PDF, 4 MB]
12:05 - 12:20 hActivities of the IERS Working Group Site Survey and Co-location

J. Dawson (presented by B. Richter)

Download:
Activities of the IERS Working Group 2 - Site Survey and Co-location (PDF, 46KB, Not barrier-free file.) (not accessible) [PDF, 46 KB]
12:20 - 12:50 hDiscussion
12:50 - 14:00 hLunch
Session 2Long Time Series and Their Combination (ITRF, IERS200x, ...)

chaired by P. Willis
14:00 - 14:15 hCelestial pole offsets and universal time - combination of VLBI/GPS measurements

J. Vondrak

Download:
CELESTIAL POLE OFFSETS AND UNIVERSAL TIME - combination of VLBI/GPS measurement

(PDF, 5MB, Not barrier-free file.) (not accessible) [PDF, 5 MB]
14:15 - 14:30 hThe JCET/GSFC (SLR) TRF Solution 2004

E. Pavlis

Download:
The JCET/GSFC (SLR) TRF Solution 2004 (PDF, 3MB, Not barrier-free file.) (not accessible) [PDF, 4 MB]
14:30 - 14:45 hAnalysis and combination of weekly input data

D. Angermann, B. Meisel, M. Krügel

Download:
Analysis and Combination of weekly input data (PDF, 4MB, Not barrier-free file.) (not accessible) [PDF, 4 MB]
14:45 - 15:00 hTime series combination - recent results

Z. Altamimi

Download:
Time Series Combination

Recent Results (PDF, 329KB, Not barrier-free file.) (not accessible) [PDF, 329 KB]
15:00 - 15:15 hITRF2004

C. Boucher

Download:
ITRF2004 - Claude Boucher - ITRF Product Center (PDF, 126KB, Not barrier-free file.) (not accessible) [PDF, 126 KB]
15:15 - 15:25 hIERS200x

M. Rothacher

Download:
IERS200x: Plan (PDF, 735KB, Not barrier-free file.) (not accessible) [PDF, 735 KB]
15:25 - 15:35 hIDS Analysis Coordinator plans related to the IERS combination projects: Combination Pilot Project, ITRF2004, IERS 200x

M. Feissel-Vernier (presented by P. Willis)

Download:
IDS Analysis Coordinator plans related to the IERS combination projects: Combination Pilot Project, ITRF2004, IERS 200x (PDF, 7KB, Not barrier-free file.) (not accessible) [PDF, 8 KB]
15:35 - 16:00 hDiscussion
16:00 - 16:30 hCoffee break
Session 3Database and Information Systems

chaired by E. Pavlis
16:30 - 16:45 hIERS Database and Information System

B. Richter, W. Schwegmann

Download:
IERS Information- and Database System (PDF, 1MB, Not barrier-free file.) (not accessible) [PDF, 2 MB]
16:45 - 17:00 hThe Indigo Project

A. Moore

Download:
INDIGO: Inter-service Data Integration for Geodetic Operations (PDF, 384KB, Not barrier-free file.) (not accessible) [PDF, 384 KB]
17:00 - 17:15 hDiscussion

General Discussion and Action Items

17:15 - 18:15 hDiscussion and Action Items

M. Rothacher
Cookies